Real project documentation
Custom shower construction: the work behind the finished tile.
A finished shower hides most of the work that determines whether the project performs correctly. This real photo sequence documents several important construction stages before tile and glass.

Project sequence
Real photos from the work.

Opening the shower area and exposing the drain path before rebuilding.

Drain and floor preparation before the shower base is completed.

Building the base conditions needed for the shower floor.

Wall substrate and recessed niche construction before finish surfaces.

Waterproofing work at the shower floor before tile.

Wall board and niche ready for the next waterproofing/finish stages.
Why documentation matters
Photos turn hidden or temporary conditions into a permanent project record.
That record helps explain what was found, what changed, and what was completed. It also gives future service work a better starting point.
Project takeaways
- Shower performance depends on what happens before tile.
- Drain, pan, substrate, niche, and waterproofing details must be sequenced correctly.
- Progress photos preserve a record of concealed work that will not be visible after completion.